Seamist, Watergate Bay
- Client: The Hotel & Extreme Academy
- Project Value: £600k
- Duration: 8 months
- Location: Tregurrian, Newquay
- Client: The Hotel & Extreme Academy
- Project Value: £600k
- Duration: 8 months
- Location: Tregurrian, Newquay
Overview
Seamist is a stunning new architectural-designed coastal pad situated in the village of Tregurrian. Planned with larger parties in mind, Seamist benefits from bright and spacious living areas including a games room, cinema room, gardens and outdoor shower which make the most of views down the valley to the sea and Watergate Bay.
A large 8 bedroom 7 en-suite property, with equally spacious living spaces, traditionally built with a twist, and to demanding programme and budget, We Are Ease was once again first point of call for the Watergate Bay Hotel team.
The ground needed to be piled and block and beam floor laid. 4inch block to external walls, 6inch high strength thermal block work to the internal skin. Pozi joists and pug mix used to first floor to reduce sound transmition between floor levels. A high spec finish throughout to include floor to ceiling sliding doors to ground and first floors; log burners; beamed ceilings; full-width juliet balcony to first floor to make the most of sea views; two oak staircases providing access to the 1st floor bedrooms, where bedrooms and en-suites are finished to a boutique hotel standard, with comforts and details expected at this level.
Externally there is a paved area with the remainder laid to lawn, a beautiful rotunda external shower area for washing down following lazy days at the beach! Parking area created for up to eight cars.
Key Project Stages
✓ Leading excellent contractor commitment
✓ Flexibility with client-lead design changes
✓ Very tight programme to achieve seasonal rental market
✓ Repeat client
Will Ashworth, Managing Director at The Hotel & Extreme Academy
"We Are Ease continually display a unique characteristic in my experiences of the building industry with all my dealings with them, from planning to procurement through construction to completion, where our interests are at the heart of their core values and aims. I could not have wished for a smoother operation managed by Ease through what could have been such a complicated and stressful major redevelopment for the hotel. Their hard work and commitment to providing cost effective solutions through an open, honest, direct dialogue and relationship between ourselves and all parties involved was their greatest strength and one of the reasons this phase of work was delivered so successfully within budget and time"