Invisible Worlds, Eden Project

Overview

Invisible Worlds is a major new permanent exhibition within the Eden Project’s transformed Core Building, that reveals the world beyond the senses: too big, too small, too fast, too slow, too far away in space and time. The centrepiece of the exhibition is at over eight metres tall, Infinity Blue, one of the world’s largest ceramic sculptures, with the added surprise of blowing out vapour rings!

Key stages of works included:
  • Inspect condition of existing floor make up and strengthen where needed in line with structural engineers detail.
  • Floor strengthened to accommodate new interpretation pieces with increased point loading.
  • Reconfiguration of existing WCs to better accommodate the increased footfall.
  • Adaptions to fire and sprinkler systems to allow for the newly configured layout.
  • New classroom and laboratory space created with Data and electrical install to accommodate New interactive screens.
  • Newly installed kitchen servery to make better use of front of house area and increase covers.
  • New decoration and floor finishes throughout.
Invisible Worlds Eden Project St Austell Cornwall
Invisible Worlds Eden Project St Austell Cornwall
Invisible Worlds Eden Project St Austell Cornwall

Key Project Stages

Ambitious delivery period, to fulfil Eden operational objectives;
Challenging budget;
Working closely with large Eden team;
Eden Project kept open to public as normal, therefore considerate construction adopted;
Gus Grand, Head of Policy, Eden Project, said:
“Thanks to We Are Ease we were able to open the exhibition on time and on budget, without drama and without excessive stress.”

Are you in the early stages of planning your building, but not quite sure how best to move it forward? As the leading construction management provider in the south west, we can assist you with your how to get things moving; feasibility; advise you an unbiased realistic budget based on current market conditions; advise what your budget might achieve for you; introduce you to the right level of specialist design required, from architects to landscape; where cost is limiting you taking things forward, we can identify value engineering to see if we can bring you savings to meet your budget, without limiting your aspirations and goals.

Contact us today.

Alternatively, speak with one of the team, Senior Manager Andrew Doidge, direct on 07484 035027 to discuss your requirements further.

Growing Point, Eden Project

Got the planning and are ready to go, but have been somewhat disheartened by the costs being returned by the builders tendering? Come to us – construction management can bring massive savings over traditional building. We identify the savings for the benefit of you and your build, as opposed to increasing the profit of the builder.

Contact us today.

Alternatively, speak with one of the team, Senior Manager Andrew Doidge, direct on 07484 035027 to discuss your requirements further.

Harbour Beach Club Hotel & Spa

Fallen out with your builder? Costs spiralling out of control? WAE and construction management is perfectly placed to step in quickly to replace whatever mishap might be currently evolving on your project. Contact us to discuss how we can help. Ease and CM can most likely remobilise things quicker than you are identifying and involving another builder to take over the incomplete works. Difficult events are, they needn’t be as cataclysmic as they might initially seem.

Contact us today.

Alternatively, speak with one of the team, Senior Manager Andrew Doidge, direct on 07484 035027 to discuss your requirements further.

The Neighbourhood, Student Accommodation