The Beach Hut, Watergate Bay
- Client: Watergate Bay Hotel & Extreme Academy
- Project Value: £178k
- Duration: 5 weeks
- Location: Watergate Bay, Newquay
- Client: Watergate Bay Hotel & Extreme Academy
- Project Value: £178k
- Duration: 5 weeks
- Location: Watergate Bay, Newquay
Overview
In conjunction with the already very busy programme of Winter Works at Watergate Bay Hotel, We Are Ease undertook the ambitious complete internal and external refurbishment of the popular and loved Beach Hut restaurant on Watergate Bay beach, and an ambitious 5 weeks period.
Initially, the structure was completely stripped right back to expose where essential structural and waterproofing works would be required. A new glazing system was installed, new entrance layout constructed, complete rearrangement of the dining areas including banquette tables, new bar position and upgraded and dramatically transformed male, female and disabled toilets. A complete revamped interior design was fitted out, and external elevations improved.
The result was a very fast complete transformation, allowing the Beach Hut team a better and more operationally smoother space, with added income from the additional covers achieved.
Key Project Stages
✓ A very quick works period;
✓ Managing and coordination of a lot of trades within confined spaces;
✓ Adapting to challenges uncovered through the strip out process;
✓ Restaurant reopened on time;
✓ A tight and well controlled budget.
Will Ashworth, Managing Director at The Hotel & Extreme Academy
We Are Ease continually display a unique characteristic in my experiences of the building industry with all my dealings with them, from planning to procurement through construction to completion, where our interests are at the heart of their core values and aims.